Case Study: Dynamic Heat Map for Level 5 Commissioning

A Fortune 50 Commercial Bank (the Client) in Virginia was interested in  the airflow in a data center when all electrical power is suddenly remobed by shutting all the CRAC Units simultaneously . In 2019, Purkay Labs was invited to measure and create a dynamic heat map of the airflow during various Level 5- Integrated Systems Test of a Data Center being commissioned In this instance, the Client wanted to see what happens to the airflow in the data center in the time between power loss and the generators coming back online. As a result of Purkay Labs test, Client found that they had 10 minutes between power loss and the generator’s power restoration before the critical temp of 120 degrees was reached. Purkay Labs dynamic heat map also illustrated which aisles were most at risk.